Connecticut EV Charging Program - residential Level 2 charger and wiring upgrade rebate (Eversource / UI)
up to $1,500
Up to $1,500 in rebates from 2 programs. 67 licensed installers based in Meriden.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
Loading map…
29 public charging stations in Meriden: 84 Level 2 ports and 8 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Meriden, CT - Tesla Supercharger | 903 East Main Street | 8 fast | Tesla | 24 hours daily. NACS partner enabled. |
| 599 Research Pkwy | 599 Research Pkwy | 8 Level 2 | Non-Networked | 24 hours daily |
| 164 Scott St | 164 Scott St | 4 Level 2 | Non-Networked | 24 hours daily |
| 66 Westwood Knoll | 66 Scott St | 4 Level 2 | Non-Networked | 24 hours daily |
| 67 Westwood Knoll | 67 Westwood Knolls | 4 Level 2 | Non-Networked | 24 hours daily |
| 68 Westwood Knolls | 68 Westwood Knolls | 4 Level 2 | Non-Networked | 24 hours daily |
| 69 Westwood Knoll | 69 Westwood Knolls | 4 Level 2 | Non-Networked | 24 hours daily |
| 70 Scott St | 70 Scott St | 4 Level 2 | Non-Networked | 24 hours daily |
| 71 Scott St | 71 Scott St | 4 Level 2 | Non-Networked | 24 hours daily |
| City Parking Lot West Main | 30 Butler | 4 Level 2 | FLO | 24 hours daily |
| City of Meriden - City Hall | 142 E Main St | 4 Level 2 | Non-Networked | 24 hours daily |
| City of Meriden / 105 Miller & 22 Liberty streets | 22 Liberty street | 4 Level 2 | FLO | 24 hours daily |
| Golf Course Parking Lot | 680 Westfiled Rd | 4 Level 2 | FLO | 24 hours daily |
| CT RAIL MERIDEN | 60 State St | 2 Level 2 | ChargePoint Network | 24 hours daily |
| City of Meriden - Meriden Public Library | 105 Miller St | 2 Level 2 | Non-Networked | 24 hours daily |
| MHA CHAMBERLAIN 1 | Edgewood Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MHA CHAMBERLAIN 10 | Hollis Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MHA CHAMBERLAIN 11 | Hollis Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MHA CHAMBERLAIN 12 | Hollis Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MHA CHAMBERLAIN 2 | Edgewood Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MHA CHAMBERLAIN 3 | Andrews Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MHA CHAMBERLAIN 4 | Andrews Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MHA CHAMBERLAIN 5 | Lourdes Court | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MHA CHAMBERLAIN 6 | Lourdes Court | 2 Level 2 | ChargePoint Network | 24 hours daily |
| MHA CHAMBERLAIN 7 | Lourdes Court | 2 Level 2 | ChargePoint Network | 24 hours daily |
Showing 25 of 29.
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.