Connecticut EV Charging Program - residential Level 2 charger and wiring upgrade rebate (Eversource / UI)
up to $1,500
Up to $1,500 in rebates from 2 programs. 36 licensed installers based in Ellington.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
Loading map…
10 public charging stations in Ellington: 20 Level 2 ports and 4 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Bolles Motors Ellington | 84 West Road | 2 fast, 6 Level 2 | VIALYNK | 24 hours daily |
| EARTHLIGHT CPE250_1 | 128 West Rd | 1 fast | ChargePoint Network | 24 hours daily |
| EARTHLIGHT CPE250_2 | 128 West Rd | 1 fast | ChargePoint Network | 24 hours daily |
| 135 West Rd | 135 West Rd | 4 Level 2 | LOOP | 24 hours daily |
| EARTHLIGHT EARTHLIGHT HQ / | 128 West Rd | 2 Level 2 | ChargePoint Network | Mon: 12:00am-8:00am, 5:00pm-11:59pm; Tue: 12:00am-8:00am, 5:00pm-11:59pm; Wed: 12:00am-8:00am, 5:00pm-11:59pm; Thu: 12:00am-8:00am, 5:00pm-11:59pm; Fri: 12:00am-8:00am, 5:00pm-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm |
| EARTHLIGHT HQ ELT HQ-L2-1 | 128 West Rd | 2 Level 2 | ChargePoint Network | Mon: 12:00am-8:00am, 5:00pm-11:59pm; Tue: 12:00am-8:00am, 5:00pm-11:59pm; Wed: 12:00am-8:00am, 5:00pm-11:59pm; Thu: 12:00am-8:00am, 5:00pm-11:59pm; Fri: 12:00am-8:00am, 5:00pm-11:59pm; Sat: 12:00am-11:59pm; Sun: 12:00am-11:59pm |
| Ellington Town Hall | 21 Main St | 2 Level 2 | AMPUP | Ellington Public Works Dept. business hours |
| TOWN HALL ANNEX | 57 Main St | 2 Level 2 | AMPUP | Contact site for information |
| MODERN MILKMAN OAK1 | 80 Meadow Brook Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
| MODERN MILKMAN OAK2 | 80 Meadow Brook Rd | 1 Level 2 | ChargePoint Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.