Connecticut EV Charging Program - residential Level 2 charger and wiring upgrade rebate (Eversource / UI)
up to $1,500
Up to $1,500 in rebates from 2 programs. 59 licensed installers based in Bridgeport.
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). With the biggest rebate on offer here ($1,500), a typical job could cost you as little as $400.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
up to $1,500
$100 one-time enrollment incentive; ongoing up to $120/year (Baseline tier) or up to $300/year (Advanced tier)
Loading map…
23 public charging stations in Bridgeport: 74 Level 2 ports and 18 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Bridgeport, CT - Tesla Supercharger | 10 E Main St | 16 fast | Tesla | 24 hours daily. NACS partner enabled. |
| PARK CITY FORD PARKCITY01 | 65 Sylvan Ave | 1 fast | ChargePoint Network | 24 hours daily |
| PARK CITY FORD PARKCITY02 | 65 Sylvan Ave | 1 fast | ChargePoint Network | 24 hours daily |
| 855 Main St | 855 Main St | 16 Level 2 | Non-Networked | 24 hours daily |
| 140 Alice Street | 140 Alice St | 4 Level 2 | Non-Networked | 24 hours daily |
| 191 Oak st | 191 Oak St | 4 Level 2 | Non-Networked | 24 hours daily |
| 2240 E Main | 2240 E Main St | 4 Level 2 | Non-Networked | 24 hours daily |
| 240 Oak St | 240 Oak St | 4 Level 2 | Non-Networked | 24 hours daily |
| 2646 Fairfield Ave, Bridgeport | 2646 Fairfield Ave | 4 Level 2 | Non-Networked | 24 hours daily |
| 2649 Main St. Bridgeport | 2649 Main St | 4 Level 2 | Non-Networked | 24 hours daily |
| 432 Wells Street | 432 Wells St | 4 Level 2 | Non-Networked | 24 hours daily |
| Bridgeport Hospital | 267 Grant St | 4 Level 2 | Non-Networked | 24 hours daily |
| SWTCH Energy Inc. | 726 Union Ave | 4 Level 2 | SWTCH | 24 hours daily |
| SWTCH Energy Inc. | 800 Union Ave | 4 Level 2 | SWTCH | 24 hours daily |
| 349 Nichols St | 349 Nichols St | 2 Level 2 | LOOP | 24 hours daily |
| 476 Brooks St | 476 Brooks St | 2 Level 2 | LOOP | 24 hours daily |
| 62 Coleman St | 62 Coleman St | 2 Level 2 | LOOP | 24 hours daily |
| 72 Coleman St | 72 Coleman St | 2 Level 2 | LOOP | 24 hours daily |
| Crescent Crossings 1C LLC | 635 Waterview Ave | 2 Level 2 | EVGATEWAY | 24 hours daily |
| Mortons Mortuary Inc | 25 Margaret E Morton Ln | 2 Level 2 | EVGATEWAY | 24 hours daily |
| PDQ Plumbing & Heating | 681 Housatonic Ave | 2 Level 2 | LOOP | 24 hours daily |
| STATION 3030 THE WATERMARK | 3030 Park Avenue | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Windward Apartments | 20 Johnson St | 2 Level 2 | EVGATEWAY | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.