EV charger installers in Castle Rock, CO
52 licensed installers based in Castle Rock.
What it really costs in Castle Rock
A typical level 2 ev charger, simple install near panel costs $1,900 installed. Most jobs land between $800 and $3,000 (40-48a level 2 charger hardware ($300-$800), dedicated 240v circuit and breaker, short wire run (garage on same wall or near the panel), permit and inspection. assumes existing panel has spare capacity; excludes panel/service upgrade, trenching to detached garage, and load-management devices.). We haven't found a rebate for this project here right now.
Cost sources: Qmerit - New Jersey EV charger installation (average L2 install cost in NJ: $2,304); Qmerit - How much does Level 2 EV charger installation cost? (avg $1,700; most $749-$2,500); EnergySage - How much does an EV charger installation cost? (installation $800-$3,000, avg $2,442 excl. hardware). Rebates come with conditions (equipment, income, approved contractor), so check each program.
EV charger rebates in Castle Rock
We haven't found a program specific to this area yet. Statewide programs are on the state page.
EV charger installers
Castle Pines Electric
Castle Rock, 80104Castle Rock Electric, Inc.
Castle Rock, 80104Integrated Electrical Contractors, LLC
Castle Rock, 80104Lakewood Electric Co., Inc.
Castle Rock, 80109Lamil Connections, Inc.
Castle Rock, 80104Colorado Integrated Electrical Systems
Castle Rock, 80104The Wire Connection LLC
Castle Rock, 80104Lightning Electric
Castle Rock, 80108Stone Electric LLC
Castle Rock, 80104Affinity Electric LLC
Castle Rock, 80109All Seasons Electric, Inc
Castle Rock, 80104Show all 52 installers
- Brant Electric
- Butler Electric LLC (720) 882-4558
- Capitol Electric Company, Inc
- Dave O Services LLC
- Douglas County School District Re-1
- Front Range Power, Inc.
- Grasmick Electric Corp.
- JP Electrical Solutions LLC
- King Bee Electric
- Parker Electric Inc
- RK Electric Inc
- Sunwall Electric LLC
- Swede Electric Company
- T & N Brothers Electric Company LLC
- Tec Communications Inc
- The Electric Company Incorporated
- Westwind Group, Inc.
- Green Frontier Electric Ltd
- Kaje Electric
- Nytech Heating, Cooling & Plumbing LLC (303) 663-6840
- Sunnyside Electric Inc.
- Copperline Electric LLC
- Rocky Mountain Electric Co. LLC
- AJC Electric
- AnWood Electric, LLC
- Current Concepts Electric, LLC (303) 373-1715
- Sapphire Construction Inc
- Fox Hills Electric
- Full House Construction and Design, Inc.
- Infinity Plumbing and Heating LLC
- Life Electric, LLC
- Agape Electrical Services, L.L.C.
- Wattson Electric 5280 LLC (970) 216-5797
- Newbry Electric LLC
- ElectriWorks LLC
- Douglas County Facilities
- Generis Electrical Design & Installation LLC
- Lee's Electric LLC
- MAK Electric LLC
- Peak Electric, LLC
Public EV charging in Castle Rock
Loading map…
21 public charging stations in Castle Rock: 40 Level 2 ports and 28 DC fast ports.
| Station | Address | Ports | Network | Hours |
|---|---|---|---|---|
| Castle Rock, CO - Tesla Supercharger | 4612 Milestone Ln | 16 fast | Tesla | 24 hours daily. NACS partner enabled. |
| Whole Foods Castle Rock (CSR) | 6384 Promenade Pkwy | 6 fast | eVgo Network | 24 hours daily |
| Target T1326 (Castle Rock, CO) | 5010 Founders Pkwy | 4 fast | Electrify America | 24 hours daily |
| Castle Rock Ford | 1404 S Wilcox St | 2 fast | FORD_CHARGE | Mon: 9:00am-7:00pm; Tue: 9:00am-7:00pm; Wed: 9:00am-7:00pm; Thu: 9:00am-7:00pm; Fri: 9:00am-7:00pm; Sat: 9:00am-7:00pm |
| Encore CR | 20 Wilcox Street | 6 Level 2 | Blink Network | 24 hours daily |
| The Madison Apartments-Clubhouse | 1250 Sweet Spring Circle | 4 Level 2 | Blink Network | 24 hours daily |
| 215 Wilcox Street | 215 Wilcox Street | 2 Level 2 | Blink Network | 24 hours daily |
| BLDG 3 STATION AUBURN BROOK 1 | 1193 Auburn Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BLDG 3 STATION AUBURN BROOK 2 | 1193 Auburn Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| BLDG 3 STATION AUBURN BROOK 3 | 1193 Auburn Dr | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CORE SEDALIA ADVENT_CR_NORTH | 2350 Meadows Boulevard | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CORE SEDALIA ADVENT_CR_SOUTH | 2350 Meadows Boulevard | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CORE SEDALIA DC_FAIRGROUNDS | Fairgrounds Drive | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CORE SEDALIA DC_JUSTICECTR_N | 4000 Justice Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CORE SEDALIA DC_JUSTICECTR_S | 4000 Justice Way | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CORE SEDALIA DC_MILLER_BLD N | 100 Third Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CORE SEDALIA DC_MILLER_BLD S | 100 Third Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CORE SEDALIA GLENDALE OS | 12300 South Havana Street | 2 Level 2 | ChargePoint Network | 24 hours daily |
| CORE SEDALIA LE MAC | 1375 West Plum Creek Parkway | 2 Level 2 | ChargePoint Network | 24 hours daily |
| Intelsat - Castle Rock CO | 5281 Garton Rd | 2 Level 2 | AMPUP | 24 hours daily |
| Riverwalk | 115 Wilcox Street | 2 Level 2 | Blink Network | 24 hours daily |
Source: U.S. Department of Energy station locator. Confirmation dates vary by station.